Apparatus In Production

In this report the cab has begun assembly while the frame had drivetrain installed. In addition the pump was merged with the structure while the body completed initial assembly. In your next report the cab may be merged with the chassis while the pump house is painted and the body will be staged.

« 1 of 2 »

In this report the cab completed the paint process while the frame was built, the pump house structure was staged and the body is making progress in paint. In your next report the cab may begin assembly while the chassis frame build continues, the pump house makes progress with assembly and the body continues in paint.

In this report the cab started the paint process while the pump house structure was staged and body fabrication began. In your next report the cab may make progress in paint while the pump house makes progress with assembly and body fabrication continues. Due to the Pierce holiday shutdown your next scheduled report is scheduled for week ending January 09, 2021.

Your new Pierce apparatus is now in production. This week your cab completed fabrication with release to paint and the pump house structure was built. In your next report the cab may begin paint while the pump house assembly continues.